Loading map data. Please wait...
If map does not load, reload page or contact us.
Error in loading map. Go back to Search page and try again.
The project consists of three primary components.
1)The existing four-way stop-controlled intersection will be upgraded with a traffic signal and intersection lighting, along with construction of a right-turn lane on Diamond Causeway at Green Island Road and a right-turn lane on McWhorter Drive.
2)A 10-foot multi-use path on the southside of Diamond CSWY will be constructed that will connect the future Green Island Road path to the Lake Street/Westcross Road intersection.
3)The intersection at Lake Street/Westcross Road and Diamond CSWY will be upgraded with new equipment meeting GDOT current standards.