Phase:
Preliminary Engineering

Project Manager:
Tina Bockhold

Contact Email:
GreenIslandRoadPath@chathamcounty.org


Documents

Loading map data. Please wait...
If map does not load, reload page or contact us.

 

Project Update: Concept has been approved by GDOT.  Report can be found here:LSCR Concept Report(please note that this link directs you to GDOT's project page then scroll to the bottom under project documents and click to download the approved project concept.)

On December 5, 2024, Chatham County Engineering held an Open House Community Meeting at Skidaway Island Baptist Church from 4 PM to 7 PM.  At this drop in style meeting, the project concept was on display and Chatham County representatives were available to answer questions. Based on feedback from this meeting and an online survey that was conducted from Dec. 6 to Jan. 3, the original concept showing the path crossing Green Island Road was revised.  The new alignment shows the path running along the westside of Green Island Road. The concept was sent to GDOT for approval in March and was approved by GDOT in June 2025. Preliminary plans and Right of Way Plans are being finalized.  Project is on schedule for a November 2027 let for construction date.

Green Island Road Path is an off-road, multipurpose trail that is proposed to run adajacent to Green Island Road from Diamond Causeway to the cul-de-sac, approximately 2.1 miles in length.  A seperate county project is underway which signalizes the 4-way stop and extends the Green Island Path project to Lake Street.